Latest Jobs

Civil/ Structural CAD Technician - Aecosim Civil / Structural Circa £40 (Limited) Civil/Structural CAD Technician - Aecosim The position is for an experienced Senior 3D CAD Modell...
CAD Technician/ 3D Highway Design Civil / Structural, Highways £35 (Limited) CAD Technician / Highway Design To start as soon as possible (role is until September 2019) T...
Document Controller (Urgent) Information Management £Neg Document Controller Job Scope: This role is key to the delivery of Project Information Manage...
Process Engineer Instrumentation / Control Systems, Process £Neg Senior Process Engineer To work on BP WND project Candidate will have: • Gas...
Civil/ Drainage Technician Civil / Structural £TBA Civil/Drainage Technician using Microstation / Autocad Civils, Roads and Drainage experience P...
ICSS Engineer (H&G) Instrumentation / Control Systems £35 (Limited) ICSS Engineer (H&G) Ideal candidate will have the following experience: *5+ years experi...
Clerk of Works (Luton) Civil / Structural £29+ (Limited) Clerk of Works Qualifications & experience required: ·Relevant experience in relevant...
Senior Electrical Engineer Electrical Circa £42 (Limited) Senior Electrical Engineer Skills/Responsibilities: Vendor print review for MV/LV Switchgear and...
<
<

Clerk of Works (Luton)

Employment Type:
Temporary
Sector:
Building
Discipline:
Civil / Structural
Grade / Seniority Level:
Engineer, Manager
Area:
UK
Region:
South East England
Salary:
£29+ (Limited)
Posted:
06-Jul-18
Job Ref:
15328

Clerk of Works

Qualifications & experience required:

·Relevant experience in relevant field in civil construction contracts
·At least 5 years experience
·Experience in MPT/MEP/airport in construction contracts

The project connects Network Rail’s Luton Airport Parkway Station to Luton Airport Terminal along the new 2km MPT network.
The works consist of two stations one elevated to tie in with the NR station and the other below ground level at airport terminal.
It includes, a viaduct, signature bridge, surface level slab continuing into a retained section followed by cut and cover works under airport Taxiway Bravo continuing up to the Terminal.

Based on site at Luton Airport

Duration: 18+ month contract


Contact Details:
Tel: 020 7491 4491
Contact: Office
Email:

Return to search results

X
Latest Job Listings